| services value: | £485k | | contract period: | 6 Months | | client: | New College Stamford | | contractor: | Kier Marriott Rushden/Nottingham | | consultant: | Royal Haskoning | | architect: | Pick Everard |
| Mechanical and Electrical installation of New College Stamford for new entrance and adjacent alterations which includes mechanically connection of gas pipe service from meter, connection mains cold water from lower ground floor and from the Visual Arts Plantroom to New College building, new boiler and heating in Upper Ground Floor Boiler Room, LTHW for underfloor heating, electric panel heaters in Reception & Disabled WC, ventilation in WC’s, Servery & Boiler Room, heat recovery units, air-con, HWS flow & return, sanitaryware, chlorination & water treatment of piped services and thermal insulation. Electrical installation includes PV panel in existing Switchroom, SWA mains cables for power to Upper Ground Floor to Entrance Building, internal/external light fittings & control equipment, window control, lightning system, data, TV & CCTV and fire/intruder alarm systems. |
|